Announcement

September 17, 2020

AKTIVITI PEMASANGAN RASUK JAMBATAN : Laluan Kontra Sementara di Jalan Lingkaran Tengah 2, (MRR2) KM25.8 sehingga KM26.0 Arah Sungai Besi Menghala Cheras & Penutupan Sementara Flyover MRR2 Menghala Ulu Kelang Serta Susur Keluar Dari Lebuhraya AKLEH ke MRR2.

September 17, 2020

PEMASANGAN SEGMEN CROSSHEAD : Pengaktifan Laluan Kontra di Jalan Lingkaran Tengah 2 (MRR2) Arah Sungai Besi dan Penutupan Simpang Apartment Desa Tun Razak (ADTR).

September 15, 2020

AKTIVITI PENGALIHAN & PEMASANGAN MESIN ‘BORED PILE’ : Lencongan Laluan & Penutupan Sementara Sebahagian Jalan Lingkaran Tengah 2 (MRR2) Arah Ulu Kelang Berhampiran Hotel Flamingo

September 14, 2020

AKTIVITI PEMINDAHAN & PEMASANGAN RASUK JAMBATAN : Lencongan Sementara Sebahagian Laluan di Jalan Taman Putra & Penutupan Jalan Hulu Langat.

September 14, 2020

AKTIVITI PEMASANGAN ‘SAFETY NETTING’ : Laluan Kontra Sementara di Jalan Lingkaran Tengah 2 (MRR2) KM25.8. sehingga KM26.0 Arah Sungai Besi Menghala Cheras & Penutupan Sementara Jalan Kerja Ayer Lama.

September 14, 2020

AKTIVITI PEMASANGAN RASUK JAMBATAN : Pengaktifan Lencongan Sementara Sebahagian Laluan di Jalan Lingkaran Tengah Dua (MRR2) Bermula KM37.7 Sehingga KM38.4, Kedua-dua Arah.

September 10, 2020

AKTIVITI PEMASANGAN SEGMEN CROSSHEAD: Laluan Kontra Sementara di Jalan Lingkaran Tengah 2 (MRR2) dan Penutupan Simpang Jalan 21/146 (berhampiran Kem Transmitter Sungai Besi)

September 9, 2020

AKTIVITI PEMASANGAN RASUK JAMBATAN : Laluan Kontra Sementara di Jalan Lingkaran Tengah 2, (MRR2) KM25.8 sehingga KM26.0 Arah Sungai Besi Menghala Cheras.

September 8, 2020

AKTIVITI PEMASANGAN SEGMENTAL BOX GIRDER (SBG) : Penutupan Sebahagian Lorong di Jalan Lingkaran Tengah 2 (MRR2), Arah Gombak.

September 8, 2020

AKTIVITI PEMASANGAN RASUK JAMBATAN : Penutupan Sementara Sebahagian Lorong di Lebuhraya KESAS, KM51.1 sehingga KM51.8 Arah Ulu Kelang.